4/12/2023 0 Comments Removing coils from york ycalGeneral Chiller Information & Safety FORM 201.19-NM1 (204) RESPONSIBILITY FOR SAFETY MISUSE OF EQUIPMENT Every care has been taken in the design and manufacture of the unit to ensure compliance with the safety requirements listed above. The unit is intended for cooling water or glycol solutions and is not suitable for purposes other than those specified in this manual. 9 – POWER PANEL SECTION.įORM 201.19-NM1 (204) GENERAL CHILLER INFORMATION & SAFETY 1 INTRODUCTION YORK YCAS chillers are manufactured to the highest design and construction standards to en sure high performance, reliability and adaptability to all types of air conditioning installations. 195 Scheduled Maintenance.195 ON-BOARD BATTERY BACK-UP. 123 1.įORM 201.19-NM1 (204) TABLE OF CONTENTS (CONT’D) SECTION 11 - TROUBLE SHOOTING SECTION 9 - MAINTENANCE GENERAL REQUIREMENTS. INTRODUCTION & PHYSICAL DESCRIPTION 123 1.1 General. 35 Run Contact.35 Alarm Contacts.įORM 201.19-NM1 (204) TABLE OF CONTENTS (CONT’D) SECTION 8 - MICRO PANEL CONTENTS CHILLERLER CONTROL PANEL PROGRAMMING AND DATA ACCESS KEYS. 34 Remote Emergency Stop Device.35 CONTROL PANEL WIRING.35 VOLTS FREE CONTACTS. 9 RESPONSIBILITY FOR SAFETY.10 ABOUT THIS MANUAL.įORM 201.19-NM1 (204) TABLE OF CONTENTS (CONT’D) Units with Single-Point Power Supply Wiring. 9 WARRANTY.9 SAFETY.9 Standards for Safety. Each of these items has the potential, if misused or handled improperly, to cause bodily injury or death.įORM 201.19-NM1 (204) TABLE OF CONTENTS SECTION 1 - GENERAL CHILLER INFORMATION & SAFETY INTRODUCTION. During installation, operation, maintenance or service, individuals may be exposed to certain components or conditions including, but not limited to: refrigerants, oils, materials under pressure, rotating components, and both high and low voltage. Literature updates that may occur will be printed on the Revision Sheet and included with the Installation, Operation & Maintenance (IOM) man, which is provided with new equipment.įORM 201.19-NM1 (204) IMPORTANT! READ BEFORE PROCEEDING! GENERAL SAFETY GUIDELINES This equipment is a relatively complicated apparatus. AIR-COOLED SCREW LIQUID CHILLERS INSTALLATION, OPERATION & MAINTENANCE New Release Form 201.įORM 201.19-NM1 (204) CHANGEABILITY OF THIS DOCUMENT In complying with YORK’s policy for continuous product improvement, the information contained in this document is subject to change without notice.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |